Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks

Product Details
Customization: Available
After-sales Service: 1 Year
Warranty: 1 Year
Still deciding? Get samples of US$ 8/Piece
Request Sample
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 15 days
to see all verified strength labels (7)
  • Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
  • Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
  • Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
  • Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
  • Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
  • Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
Find Similar Products

Basic Info.

Model NO.
AM2023
Connection
Bolts
Working Pressure
Pn10
Body Material
UPVC
Rubber Sealing
NBR
Working Temperature
- 20ºC~ +120ºC
Range of Sizes
DN50-500mm
Bolt & Nut
Grade 4.8 Zinc-Plated Carbon Steel
Transport Package
Carton Box
Specification
P355
Trademark
GREAT WALL
Origin
China
HS Code
7307290000

Product Description

UPVC Repair Clamps 
Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks




1. Briefs : 

*  Suit for emmergency leaking pipe repair under presure
*   Working Pressure : PN10/ PN16

2. Features :

*  Suit for PE, PVC, UPVC, HDPE  Pipe
*  Suit for Straight Pipe, Butt Fusion Joint, Socket Fusion Joint,Tee Joint 
*   leaking pipeline quickfix
*   easy installation and dismantle 

3.  The list of sizes 
 
S/N Description Size Pressure
mm inch Mpa
1 UPVC Repair Clamps Straight Fix DN50 2'' 1.0
2 UPVC Repair Clamps Straight Fix DN63 2.5'' 1.0
3 UPVC Repair Clamps Straight Fix DN75 3'' 1.0
4 UPVC Repair Clamps Straight Fix DN90 3.5'' 1.0
5 UPVC Repair Clamps Straight Fix DN110 4.5'' 1.0
6 UPVC Repair Clamps Straight Fix DN125 5'' 1.0
7 UPVC Repair Clamps Straight Fix DN140 5.5'' 1.0
8 UPVC Repair Clamps Straight Fix DN160 6.5'' 1.0
9 UPVC Repair Clamps Straight Fix DN180 7'' 1.0
10 UPVC Repair Clamps Straight Fix DN200 8'' 1.0
11 UPVC Repair Clamps Straight Fix DN225 9'' 1.0
12 UPVC Repair Clamps Straight Fix DN250 10'' 1.0
13 UPVC Repair Clamps Straight Fix DN280 11'' 1.0
14 UPVC Repair Clamps Straight Fix DN315 12.5'' 1.0
15 UPVC Repair Clamps Straight Fix DN355 14'' 1.0
16 UPVC Repair Clamps Straight Fix DN400 16'' 1.0
17 UPVC Repair Clamps Straight Fix DN500 20'' 1.0
           
1 UPVC Repair Clamps Tee Fix DN63 2.5'' 1.0
2 UPVC Repair Clamps Tee Fix DN75 3'' 1.0
3 UPVC Repair Clamps Tee Fix DN90 3.5'' 1.0
4 UPVC Repair Clamps Tee Fix DN110 4.5'' 1.0
5 UPVC Repair Clamps Tee Fix DN160 6.5'' 1.0
           
1 UPVC Repair Clamps Bend Fix DN63 2.5'' 1.0
2 UPVC Repair Clamps Bend Fix DN75 3'' 1.0
3 UPVC Repair Clamps Bend Fix DN90 3.5'' 1.0
4 UPVC Repair Clamps Bend Fix DN110 4.5'' 1.0
5 UPVC Repair Clamps Bend Fix DN160 6.5'' 1.0

 
4. Installation 
 
Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks
Durable DN50-500mm Repair Clamp for Straight and Elbow Leaks



5. Cautions of Installation : 
 
a. UPVC repair clamps is only suit for Butt Fusion Joint and Socket Fusion Joint of Plastic Pipe but it's not suit for Electro Fusion Joint of Plastic Pipe.
 
b. The size and pressure rating of UPVC repair clamps should be match up with the size and pressure rating of leaking pipeline. The pressure rating of UPVC repair clamps is 1.0 Mpa ( 10 bar ) and it is prohibited to use UPVC repair clamps if the operation pressure of your pipeline is above 1.0 Mpa (10 bar )
 
c. You should check the surface of UPVC repair clamps if there is any crack or damage before installation and the UPVC repair clamps with crack or damage is prohibited to use .
 
d. The pressure of pipeline should be reduced before installation of UPVC repair clamps .
 
e. The oxidizing material and mud on the surface of pipeline should be cleaned before installation and then check the breakage of pipeline and the broken pipeline should be cut off and replaced if it's long and you are not recommended to use UPVC repair clamps for the leaking pipeline with the oversize breakage.
 
f. Put the lubricant ( such as soap water, detergent and etc) on the pipeline surface and rubber gasket of repair clamps for the role of lubrication which is needed for position adjustment of repair clamps during installation process .
 
g. uninstall the vent hole plug of repair clamps and then fix the leaking position with two half bodies of repair clamps and fasten with bolts and nuts in diagonal direction .
 
h. wrap the plug with tape and fix into vent hole of repair clamps
 
i. You should not start the pump until air inside the pipeline exhausted by the exhaust device of pipeline and then restore pipeline pressure when air exhausted .

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier